• RizzoTheSmall@lemm.ee
    link
    fedilink
    English
    arrow-up
    43
    ·
    10 months ago

    What’s not covered is the 25 years of R&D in advance of waterfall project starting, or that it’s delivered 200% over time and cost due to those requirements being insufficient and based on assumptions that were never or are no longer true.

    • madjo@feddit.nl
      link
      fedilink
      arrow-up
      1
      ·
      10 months ago

      But at least the rocket has an opulent ball room as per the design spec