robocall@lemmy.world to Programmer Humor@programming.dev · 9 months agoDad has the chops to be a project manager.lemmy.worldimagemessage-square92fedilinkarrow-up11.21Karrow-down17
arrow-up11.21Karrow-down1imageDad has the chops to be a project manager.lemmy.worldrobocall@lemmy.world to Programmer Humor@programming.dev · 9 months agomessage-square92fedilink
minus-squareMechanicalJester@lemm.eelinkfedilinkarrow-up3·9 months agoIf the timing is critical then the only reasonable solution is to cut scope and features until it fits. The triangle isn’t a rubbery floppy thing, it is iron!
minus-squaredeadbeef79000@lemmy.nzlinkfedilinkarrow-up1·9 months agoThey fully subscribed to the mythical man month. So they just threw bodies at it and then couldn’t understand why the project got slower.
minus-squareMechanicalJester@lemm.eelinkfedilinkarrow-up2·9 months agoI don’t understand your statement. The Mythical Man Month teaches exactly that lesson of more bodies != Faster in many cases. How long to build the site with 1 full stack dev? 1.5 years. How long with an existing high performance team of 5? 2 months. How long if you hire 4 plus the one original (all qualified)? 1 to 1.5 years. How long if we hire 30 full stack devs? Maybe never.
minus-squaredeadbeef79000@lemmy.nzlinkfedilinkarrow-up1·9 months agoPoorly worded on my part. They fully bought into the idea of the man-month without realising it was mythical.
minus-squareMechanicalJester@lemm.eelinkfedilinkarrow-up2·9 months agoYou know? I literally figured that out a minute before I saw your reply. And I rolled my eyes at myself. That makes sense. Silly me Cheers
If the timing is critical then the only reasonable solution is to cut scope and features until it fits.
The triangle isn’t a rubbery floppy thing, it is iron!
They fully subscribed to the mythical man month. So they just threw bodies at it and then couldn’t understand why the project got slower.
I don’t understand your statement. The Mythical Man Month teaches exactly that lesson of more bodies != Faster in many cases.
How long to build the site with 1 full stack dev? 1.5 years.
How long with an existing high performance team of 5? 2 months.
How long if you hire 4 plus the one original (all qualified)? 1 to 1.5 years.
How long if we hire 30 full stack devs? Maybe never.
Poorly worded on my part.
They fully bought into the idea of the man-month without realising it was mythical.
You know? I literally figured that out a minute before I saw your reply. And I rolled my eyes at myself.
That makes sense. Silly me